Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Wuhan GDZX Power Equipment Co., Ltd
Home ProductsTransformer Testing Equipment

Full-automatic three phase Transformer on-load switch tester 110kv

China Wuhan GDZX Power Equipment Co., Ltd certification
China Wuhan GDZX Power Equipment Co., Ltd certification
Product is good by performance, yes it is good for xxxxxx market.

—— Mr Dudani

Your product received very good, we will order one more piece

—— JS

You are very nice company. Thanks for your hospitality i spend very informative in your office

—— Yousri

Good for whatever the product or service, you got my trust through this deal.

—— Rahul

Very reliable supplier and partner, solving my question with great patience and perfession.

—— Gaurav

I'm Online Chat Now

Full-automatic three phase Transformer on-load switch tester 110kv

Full-automatic three phase Transformer on-load switch tester 110kv
Full-automatic three phase Transformer on-load switch tester 110kv Full-automatic three phase Transformer on-load switch tester 110kv Full-automatic three phase Transformer on-load switch tester 110kv Full-automatic three phase Transformer on-load switch tester 110kv Full-automatic three phase Transformer on-load switch tester 110kv Full-automatic three phase Transformer on-load switch tester 110kv

Large Image :  Full-automatic three phase Transformer on-load switch tester 110kv

Product Details:
Place of Origin: CHINA
Brand Name: GDZX
Certification: ISO9001
Model Number: ZXYZ-2012
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: USD$4295.00 - $9500.00 / Sets
Packaging Details: Packed in wooden case or carton
Delivery Time: 8-15 working days
Payment Terms: L/C, T/T
Supply Ability: 1200 Sets/Year
Detailed Product Description
Product Name:: Transformer On Load Tap Changer Tester Product Name: Transformer Loading Tap Switch Tester
Working Power: AC220V ± 10%, 50Hz ± 10% Measurement Range Of Transition Resistance:: 1A Gear: 0.4 Ω~20 Ω; 0.2A Gear: 10 Ω~100 Ω;
Three Phase Constant Current Source Charging, Charging Current:: 3A/1A; 0.6A/0.2A Gear; Maximum Range Of Transition Resistance:: 100 Ω;
Environmental Conditions:: -10 ~ 40 ℃; <85%RH; Size And Weight:: 52*41*41cm; 20kg
High Light:

current transformer test set

,

transformer testing machine

                                                On-Load Voltage Regulation Switch Tester


Product introduction :

The tester can record switch operation waveform in overall process. Save 100 sets of data automatically .

It can testvarious parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.

The instrument features highly intelligent, English menu prompts, simple operation. Instrument small size, light weight, strong anti-interference ability. It is ideal instrument to ensure safe production and good quality in powerplants units, transformer manufacturing industry.


 

Transformer On load Switch Changer Tester Features :


1. Large output current, light weight.
2. Open circuit voltage 28V, 1A gear for testing 10Ω transition resistance, 0.5A, 0.3A for larger transition resistance.
3. Perfect protection circuit, reliable to use.
4. Vertical chassis structure, 5.7-inch large LCD display, easy site operation.
5. U disk storage function



 
 Product Parameters:
 

Output current

1. 1.0A, 0.5A, 0.3A gears

Resistance range

1.0A: 0.1 ~ 10Ω; 0.5A: 5 ~ 20Ω; 0.3A: 10 ~ 40Ω

Resistance measurement accuracy

± (reading × 5% + 5 words), resolution: 0.01Ω.

Transition time measurement range:

1 ~ 250mS.

Transition time measurement accuracy

± 1mS, resolution: 0.1mS.

Sampling frequency 10K
Storage

U disk storage, local storage.

 
 
Operating temperature

-20 ℃ ~ +50 ℃
Environmental humidity ≤ 90% RH, no condensation
Working power

AC220V ± 10%, 50Hz ± 10%

 

 

   Full-automatic three phase Transformer on-load switch tester 110kv 0

 


 

Some customer feedback :

 

Full-automatic three phase Transformer on-load switch tester 110kv 1


Our Sevice :
 

 

1.png

Professional Consulting Services

Detailed Information About Products

Reasonable Price

Welcome Customer Visit

 

2.png

 

 

 

Signing Contracts And Technical Agreements

Ensure Execution Of Contract And Agreement

Active Communication

Complete After-Sales Service

 

logo.png

Professional After-Sale Service Team

1 Year Free Warranty, Life-Long Maintenance

Help Troubleshooting Within 24 Hours

Professional R & D Team

 

Full-automatic three phase Transformer on-load switch tester 110kv 5

PLEASE NOTE :

Dry type Testing Transformer ,Hipot Transformer Control Unit

Wuhan GDZX Power Equipment Co.,Ltd OFFER YOU :

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 15 DAYS.
4: SMALL ORDER WELCOME..
5: ONLINE PAYMENT.
6: SUPPORT One year free warranty, three years quality assurance, lifetime maintenance.
7: AFTER SALES SERVICES 24/7

 

Contact Details
Wuhan GDZX Power Equipment Co., Ltd

Contact Person: harry@gdzxdl.com

Tel: +8617362470062

Send your inquiry directly to us (0 / 3000)