Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Wuhan GDZX Power Equipment Co., Ltd
Home ProductsTransformer Testing Equipment

Full-Automatic Three Phase Transformer On-Load Switch Tester

China Wuhan GDZX Power Equipment Co., Ltd certification
China Wuhan GDZX Power Equipment Co., Ltd certification
Product is good by performance, yes it is good for xxxxxx market.

—— Mr Dudani

Your product received very good, we will order one more piece

—— JS

You are very nice company. Thanks for your hospitality i spend very informative in your office

—— Yousri

Good for whatever the product or service, you got my trust through this deal.

—— Rahul

Very reliable supplier and partner, solving my question with great patience and perfession.

—— Gaurav

I'm Online Chat Now

Full-Automatic Three Phase Transformer On-Load Switch Tester

Full-Automatic Three Phase Transformer On-Load Switch Tester
Full-Automatic Three Phase Transformer On-Load Switch Tester Full-Automatic Three Phase Transformer On-Load Switch Tester Full-Automatic Three Phase Transformer On-Load Switch Tester Full-Automatic Three Phase Transformer On-Load Switch Tester Full-Automatic Three Phase Transformer On-Load Switch Tester Full-Automatic Three Phase Transformer On-Load Switch Tester

Large Image :  Full-Automatic Three Phase Transformer On-Load Switch Tester

Product Details:
Place of Origin: CHINA
Brand Name: GDZX
Certification: ISO9001
Model Number: ZXYZ-2012
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: USD$4295.00 - $9500.00 / Sets
Packaging Details: Packed in wooden case or carton
Delivery Time: 8-15 working days
Payment Terms: L/C, T/T
Supply Ability: 1200 Sets/Year
Detailed Product Description
Product Name:: Transformer On Load Tap Changer Tester Product Name: Transformer Loading Tap Switch Tester
Working Power: AC220V ± 10%, 50Hz ± 10% Measurement Range Of Transition Resistance:: 1A Gear: 0.4 Ω~20 Ω; 0.2A Gear: 10 Ω~100 Ω;
Three Phase Constant Current Source Charging, Charging Current:: 3A/1A; 0.6A/0.2A Gear; Maximum Range Of Transition Resistance:: 100 Ω;
Environmental Conditions:: -10 ~ 40 ℃; <85%RH; Size And Weight:: 52*41*41cm; 20kg
High Light:

current transformer test set

,

transformer testing machine

ZXYZ-2012 Transformer On Load Tap Changer Tester

 

 

Introduction

 

ZXYZ-2012 Transformer On Load Tap Changer Tester is designed according to the high voltage test equipment of the power industry standard of the people's Republic of China, and the general technical conditions DL/T846 and 8-2004. It can meet the requirements of "code for handover and preventive test of power equipment", which requires to check the action sequence of on load tap changer and measure the switching time. It can measure the transition time, transition waveform, transition resistance, three-phase synchronism and other parameters of on load tap changer. It is an ideal equipment for testing on load tap changer.

 

 

 

Features

1. Test Y0 Y △ transformer, and the resistance value is displayed directly without conversion.

2. Data analysis is humanized, which can automatically find out the fault in the middle of the waveform and mark it.

3. The waveform display is to automatically adjust the resistance value and time amplitude according to the sampled data.

4. △ type transformer can display three-phase synchronism.

5. It can be tested with or without windings.

6. The four terminal wiring mode provides high-precision resistance measurement without wire compensation.

7. Continuous test can be carried out during the test to save the time of transformer power failure.

8. The instrument can generate word report, which is convenient for data management and query.

9. The instrument is controlled by a small computer with an external configuration of 800 × 480 color LCD touch screen, high-speed printer, support external mouse, easy to operate.

10. The instrument can automatically save 1000 groups of data internally or externally connected to a USB flash disk.

 

Technical Indicators
1.Three phase constant current source charging, charging current: 3A/1A; 0.6A/0.2A gear;
2. Maximum port voltage: 24V;
3. Maximum range of transition resistance: 100 Ω;
4. Measurement range of transition resistance: 1A gear: 0.4 Ω~20 Ω; 0.2A gear: 10 Ω~100 Ω;
5. Waveform recording time length: 300ms;
6. Sampling rate: 30K;
7. Time resolution: 0.1ms;
8. Resistance resolution: 0.1 Ω;
9. Accuracy:

1) Transition resistance: ± 5% reading ± 0.1 Ω;

2) Transition time: ± 0.5% reading ± 0.2mS;

10. Environmental conditions:

1) Ambient temperature: -10 ~ 40 ℃;

2) Relative humidity: <85%RH;

11.Size and weight: 52*41*41cm; 20kg
 

 

Product pictures

 

 

 

 

PACKING AND SHIPPING
(1)We will ship products within 7-15 working days after the receipt of confirmation of your payment.
(2)All products will be well packed by robust carton or wooden box so as to ensure goods can arrive safely.
(3)Multiple shipping methods including express, sea freight, railway and so on for your choice, competitive shipping method will be advised to you.
(4)If you go with your own forwarder, we will provide all necessary documents for customs clearance.
(5)After shipping, we will remain attentive till goods well received.
If you need detailed specification, please feel free to contact us.Full-Automatic Three Phase Transformer On-Load Switch Tester 0

 



Company introduction
Wuhan GDZX Power Equipment Co.,Ltd. is a manufacturer of power test equipment, integrating design, production and sales, providing complete solutions for high-voltage testing and electrical testing services for various power users.The main products include:AC series resonance test device, high voltage test equipment, transformer test equipment, secondary protection / switch test equipment, cable fault tester, arrester test equipment, power metering equipment, standard source series and so on. There are many kinds of products and complete models.

Full-Automatic Three Phase Transformer On-Load Switch Tester 1

 

Full-Automatic Three Phase Transformer On-Load Switch Tester 2

 

Full-Automatic Three Phase Transformer On-Load Switch Tester 3

Full-Automatic Three Phase Transformer On-Load Switch Tester 4

 

 


Full-Automatic Three Phase Transformer On-Load Switch Tester 5Full-Automatic Three Phase Transformer On-Load Switch Tester 6Full-Automatic Three Phase Transformer On-Load Switch Tester 7
 

 

Service and Warranty
Service
* Provide professional consulting service; dedicated salesman and professional technical engineer to answer customer questions.
* Ensure customer get the detailed information about the product in hand.
* Reasonable price, we trust our customers should get the worth what they paid. Quotation stamped and confirmed by Manager.
* Welcome customers visit.
* The contract and the technical agreement to sign by both parties.
* Being trustworthy, follow the requirements and ensure successful implementation of signed contracts and technical agreements.
* Focus on communication, actively communicate with users, take notes of user’s questions and schedule, provide the necessary technical support.
* Move quick and efficient, professional on delivery, installation, debugging, training and others.
Warranty
* We maintains 100% customer satisfaction, please give us feedback if you fell anything wrong with the product, we will make it right for you.
* Our products are guaranteed with one year warranty and life-long tech support.
* Provide solutions within 24 hours when there is problems feedback from customer.

Full-Automatic Three Phase Transformer On-Load Switch Tester 8

 

 

FAQ:

 

1.Q: Are you trading company or manufacturer?
A: We are manufacturer.

We have R&D department, OEM& ODM services available.

 

2.Q: How long is your delivery time?
A: We usually arrange shipment within 5-7 working days after checking the payment. However, for example, the delivery time of the complete set of test devices will be a little longer, which needs to be checked in real time.

 

3.Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample, but not for free; you need pay charge and the cost of freight.

 

4.Q: What is your term of payment?
A: Payment<=5000USD, 100% in advance. Payment>5000USD, 40% T/T in advance, balance before shipment.

 

5.Q: What is the payment method?
A: We can accept Bank Transfer, T/T.

 

6.Q: Will you provide OEM service?
A: OEM & ODM services available

 

7.Q: How long is the product warranty?
A: 1 year.

 

 

Contact Details
Wuhan GDZX Power Equipment Co., Ltd

Contact Person: Emma

Tel: 86-17396104357

Fax: 86-27-65526007

Send your inquiry directly to us (0 / 3000)