Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Wuhan GDZX Power Equipment Co., Ltd
Home ProductsTransformer Testing Equipment

Three Phase 24V OLTC Transformer Test Instruments

China Wuhan GDZX Power Equipment Co., Ltd certification
China Wuhan GDZX Power Equipment Co., Ltd certification
Product is good by performance, yes it is good for xxxxxx market.

—— Mr Dudani

Your product received very good, we will order one more piece

—— JS

You are very nice company. Thanks for your hospitality i spend very informative in your office

—— Yousri

Good for whatever the product or service, you got my trust through this deal.

—— Rahul

Very reliable supplier and partner, solving my question with great patience and perfession.

—— Gaurav

I'm Online Chat Now

Three Phase 24V OLTC Transformer Test Instruments

Three Phase 24V OLTC Transformer Test Instruments
Three Phase 24V OLTC Transformer Test Instruments Three Phase 24V OLTC Transformer Test Instruments Three Phase 24V OLTC Transformer Test Instruments Three Phase 24V OLTC Transformer Test Instruments

Large Image :  Three Phase 24V OLTC Transformer Test Instruments

Product Details:
Place of Origin: China
Brand Name: GDZX
Certification: ISO9001
Model Number: ZXYZ-2000
Payment & Shipping Terms:
Minimum Order Quantity: 1Set
Packaging Details: Carton box
Delivery Time: 3-20 work day
Payment Terms: L/C, T/T, Western Union, MoneyGram
Supply Ability: 1200Set/year
Detailed Product Description
Output Current: 1.0A, 0.5A, 0.3A Gears Resistance Range: 1.0A: 0.1 ~ 10Ω; 0.5A: 5 ~ 20Ω; 0.3A: 10 ~ 40Ω.
Resistance Measurement Accuracy: ± (reading × 5% + 5 Words), Resolution: 0.01Ω. Transition Time Measurement Range: 1 ~ 250mS.
Transition Time Measurement Accuracy: ± 1mS, Resolution: 0.1mS. Sampling Frequency: 10K.
High Light:

OLTC Transformer Test Instruments

,

24V Transformer Test Instruments

,

24V OLTC Transformer Testing Equipment

Transformer Testing Equipment

Three Phase 24V Transformer On Load Tap Changer Tester 

This tester is mainly used to measure the transformer on-load tap-changer transition waveform, transition time, the instantaneous transition resistance, three-phase synchronization and so on.

 

 

The instrument features highly intelligent, English menu prompts, simple operation. Instrument small size, light weight, strong anti-interference ability.

It is ideal instrument to ensure safe production and good quality in power plants units, transformer manufacturing industry.     

 

 

Features
1.  Large output current, light weight.
2.  Open circuit voltage 28V, 1A gear for testing 10Ω transition resistance, 0.5A, 0.3A for larger transition resistance.
3.  Perfect protection circuit, reliable to use.
4.  Vertical chassis structure, 5.7-inch large LCD display, easy site operation.
5.  U disk storage function
 
 
Technical Indicators

 

1. Output current: 1.0A, 0.5A, 0.3A gears

2. Resistance range: 1.0A: 0.1 ~ 10Ω; 0.5A: 5 ~ 20Ω; 0.3A: 10 ~ 40Ω.

3. Resistance measurement accuracy: ± (reading × 5% + 5 words), resolution: 0.01Ω.

4. Transition time measurement range: 1 ~ 250mS.

5. Transition time measurement accuracy: ± 1mS, resolution: 0.1mS.

6. Sampling frequency: 10K.

7. Storage: U disk storage, local storage.

8. Operating temperature: -20 ℃ ~ +50 ℃.

9. Environmental humidity: ≤ 90% RH, no condensation.

10. Working power: AC220V ± 10%, 50Hz ± 10%

Three Phase 24V OLTC Transformer Test Instruments 0

Three Phase 24V OLTC Transformer Test Instruments 1

Three Phase 24V OLTC Transformer Test Instruments 2

Contact Details
Wuhan GDZX Power Equipment Co., Ltd

Contact Person: Emma

Tel: 86-17396104357

Fax: 86-27-65526007

Send your inquiry directly to us (0 / 3000)